SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 04-17-2006, 09:32 AM
billknny billknny is offline
Junior Member
 
Join Date: Aug 2005
Location: Sausalito, CA
Posts: 25
Send a message via Yahoo to billknny
Default Continuous loop...

I am sure this has been discussed before, but darned if I can find it, so forgive me if I repeat something previously answered...

I am adding a two-speed (4:1/8:1) mainsheet to my 40' ketch, most likely using Garhauer's blocks. This requires a continuous loop of line, leading to my question, how do I do that?

It's not a particuarly high load application, with a mainsail of 325 sq ft I figure an end boom loading of about 2300 lbs, with the 8:1 split, the load on the splice shouldn't exceed 300 lbs or so.

The splice needs to be able to run through the blocks without a problem. I guess the question is actually two part: What kind of line should I use to get the smoothest join, and where do I find the end-to-end spliceing directions?
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 06:32 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.