SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 04-26-2011, 06:27 AM
tamishel tamishel is offline
Junior Member
 
Join Date: Mar 2009
Posts: 6
Default

I'm not sure if I understand you correctly, but I think what you're contemplating has been done like below:

Pic of 'screacher' furler on sprit
http://www.sigi.ca/hi5/pictures_f33_...-2323_IMG1.htm

various pics of rigging ideas
http://www.sigi.ca/hi5/hi5/ads_72.htm


I myself have Amsteel halyards with what I'll call a 'working' side and a 'standing' side. These are made together with two long thin eyes. Crew pulls the halyard's standing end down to the eye, and then there's a downhaul/cunningham at the mast with a hook that's put through the 'working' end eye of the halyard. Tension is then achieved at the mast via the downhaul.

pics of my rig:

Screacher downhaul
http://farm4.static.flickr.com/3214/...e18_z.jpg?zz=1

Jib downhaul, showing the two eyes in the halyard and how it hooks:
http://farm3.static.flickr.com/2318/...588_z.jpg?zz=1

hope this helps

Last edited by tamishel : 04-26-2011 at 06:29 AM.
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 01:31 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.