SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #3  
Old 09-04-2009, 09:58 AM
mrgnstrn mrgnstrn is offline
Junior Member
 
Join Date: Sep 2005
Posts: 20
Default

Quote:
Originally Posted by Brion Toss View Post
Hello,
Alas, I don't have this type of splice in print or on video yet, though we have destruction-tested several variations. The principle for my favorite one is the same as a locked grommet, as seen in Book 5.
Fair leads,
Brion Toss
OK, so a brummel splice on the core-to-12strand part...got that mentally.

What about the cover and 12-strand?
Just bury the cover for looks, or do a brummel on that as well?

My intuition is that since the cover and core in the double braid section will be (should be?) sharing the load before the halyard is hauled all the way up, there should be a fairly structural splice between the cover and the 12-strand, like a brummel or a long tapered bury. Instances where the double braid would be loaded may be: while hauling a sail to the top before the 12-strand is at the winch/clutch, and when using it to haul a person to the top of the rig. right?

-M
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 02:11 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.