EDUCATION | CATALOG | RIGGING | CONSULTATION | HOME | CONTACT US |
|
#1
|
|||
|
|||
![]() Thanks for the reply. The 6:1/3:1 is an idea I will seriously consider.
Some comments: 1) The apex I was talking about is 1% stretch at 10% load which is less than Regatta braid http://www.samsonrope.com/index.cfm?...rope=87&inst=1 I see now that I should have specified that it was a Samson rope as were the other two I am considering. You are talking about the NE rope apex. 2) I agree that the Regatta was catching on something. Maybe I would be able to figure out what it was catching. Afterall, I did that 3 times already and fixed those things. But, 4 strikes and it is out. I am done fooling with it. I have had this boat for 20 years and never had any problems like that with the sta-set even without fixing all the things I fixed to try and make the regatta braid work. But then again the sta-set has its problems. The one issue I have on the two speed line is that we really like the 5:1 with the line you work coming off the boom. Also, there are 7 sheaves in a 6:1/3:1 and only 4 in my setup. It is not clear that half as much line running through almost twice the number of blocks will run much more smoothly. However, it will go twice as fast and will give more power and both of these are good things for sure. Thanks again for the help and the suggestion. Allen |
#2
|
|||
|
|||
![]() Hi again,
Oh that Apex. Samson adds Spectra to the mix, hence the lower stretch. Likely as pick-vulnerable. As for the two-speed configuration, you can rig 3:1/6:1 to have the lead come off the boom, in which case it will have only 5 sheaves, and those can be quite smooth-running. But even with the lead off the deck you might have a lot less friction than your current setup; much depends on bearing quality and relative rope size. I haven't seen the boat, but I usually would prefer the from-deck version, as it usually gives a handier belay. Fair leads, Brion Toss |
#3
|
|||
|
|||
![]() Two lines coming off the boom. Two horn cleats? Interesting. I have not considered that. Not quite sure how that would work. I have seen the 7 sheave arrangement but not a 5.
Here is a page dedicated to my boat if you are interested: http://L-36.com/papoose.php You may notice a block near the cockpit sole with a cam cleat. I use that when day sailing. When racing we bypass that and use the horn cleat. The trimmer runs the line around the horn cleat to provide some friction so he can hold the sheet and make his adjustments. In other words, we do not cleat off when racing. A bit of explanation on that. In SF bay it is typically so windy and we typically have a lot of sail up. We use the main to keep the boat under target heal. We basically put a big bubble in the main and the main trimmer has to constantly play the sheet. Anyway, sounds like Apex is out if it will be similar to Regatta. That leaves Samson LS or XLS. If you have an opinion on that selection I am all ears. Thanks so much for your advice. Allen |
#4
|
|||
|
|||
![]() any single braid will be delightful running throguh the blocks easily. Oh- don't use double blocks in a mainsheet, use fiddles or singles.that will help too.
use polyester if you want that simple all white look ( or are poor ). use swiftcord, apex, salsa, conception, racing sheet, if you can afford a dyneema/polyolifin blend and like that Christmas tree look. a fine tune is likely not needed for your boat unless you have laminate mainsail. plain dacron is crude enough to just use the major tackle to control. cheers!
__________________
Brian Duff BVI Yacht Sales, Tortola |
#5
|
|||
|
|||
![]() Quote:
My remaining question is how to cleat it for a race situation. For cruising, I will use the existing horn cleat for one end and the existing turning block and cam cleat on the cockpit sole for the other end. For racing we don't use the turning block as it is just too slow, which is why I happen to have two ways to cleat the sheet right now. For the new setup, one end can go to the main horn cleat but what about the other end? Should I add a second cleat or perhaps a pair port and starboard in addition to the main centrally located one. Allen Last edited by allene : 07-09-2009 at 11:34 AM. Reason: clarify the meaning |
#6
|
|||
|
|||
![]() Hi again,
Not clear at all on what you mean. Is there a way you could post a drawing? In any case, there should be no ends at all; the purchase's rope is formed into a grommet, with a constant-diameter splice. Looking forward to seeing a drawing or picture. Fair leads, Brion Toss |
#7
|
|||
|
|||
![]() Quote:
Well no ends, that is an interesting addition. That solves one problem I was wondering about. The question I have remains that, spliced together or not, there are two parts of the line that come off the boom that need to be secured to hold the boom in. Right now I have a horn cleat and a turning block-camcleat. With my 5:1 I use one or the other of these and with the 3:1/6:1 it is possible for me to use both but that would make some things difficult it would seem. Here is what I have now. http://l-36.com/newstuff5.JPG (please excuse the mess, this was just before I painted the cockpit and added new scuppers) http://l-36.com/traveler/Traveler1.jpg http://l-36.com/traveler/Traveler2.jpg And here is the sketch you requested: http://l-36.com/3161.gif Remember, the goal is to be able to pull the two lines hand over hand with the lines coming off the boom similar to the motion of hosting a sail. I also need to be able to play the sheet from a rail position. We like to have it wrapped half way around a cleat when we do that. That little bit of friction is just right for controlling the line. The standard solution I think involves a Harken 402 but for a number of reasons I don't like that. A possible solution is for me to make a similar piece of hardware modified for my boat layout but that would mean giving up on my goal of having the lines come off the boom. Allen Last edited by allene : 07-12-2009 at 07:55 AM. Reason: added sketch |
#8
|
|||
|
|||
![]() Here are some more pictures that I took today to add to my previous reply.
First, the day sailing cleating arrangement: http://l-36.com/ms1.jpg -- this is what I use most of the time. The racing cleat: http://l-36.com/ms2.jpg -- actually, we almost never cleat if off but just put a 1/4 turn around the bottom of the cleat and play it from the rail. The 3:1/6:1 boom side blocks (not sure about the connection that I have mocked up with the white spectra webbing): http://l-36.com/ms4.jpg The 3:1/6:1 cleated off using existing cleats: http://l-36.com/ms3.jpg Hope this makes it clear what I am trying to do. I am very uncomfortable using the existing cleating arrangement but can't think of something better. Allen |
#9
|
|||
|
|||
![]() If I can't figure out how to use two horn cleats, my backup would be to use a fiddle block and camcleats like this:
http://l-36.com/3161fiddle.gif If I use a double block like in Harken 401 or 402, then the lines would cross as the block swivels as the boom block is a fiddle block. This would keep everything in line although it would require that I fabricate the base for the camcleats. One of the posters suggested always using fiddle blocks and not doubles or tripples. As I already have enough fiddle blocks to do this, that is an added advantage. I do think, however, that two doubles and a single mounted below the boom double runs true with the single mounted crosswise. I have not figured out how to eliminate the turning blocks and use just horn cleats in a way that seems like it would be workable in race or emergency conditions. This is still my goal. Allen |
#10
|
|||
|
|||
![]() I tried out the system today and it really didn't work that well. When doing a gybe with the 3:1 configuration, all the lines got tangled up and it was basically a mess. The 6:1 was nice though. I am thinking of abandoning this setup and trying something different. Basically, taking one line to the gooseneck and then back through a block to a cleat on the cabin top or to a free winch. I have two free winches on the cabin top. One end aft and one forward. It would take two crew to do a fast gybe but at least all the lines would not get tangled. Also, this would allow the mainsheet trimmer to sit on the rail and trim from there at the aft of the cabin top. There would still be the option to trim from the stern using the swivel block cam cleat when crushing, or from a winch on the cabin top for that matter. I need to work out the blocks so it is fair.
Allen |
![]() |
Thread Tools | |
Display Modes | |
|
|