SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #1  
Old 02-02-2009, 01:54 PM
ribbony ribbony is offline
Junior Member
 
Join Date: Dec 2008
Posts: 21
Default About to re-rigg, best protocol ?

We are about to re rigg our yacht. The new Ronstan hardware and the 316 wire is on the way.

But, the mind is trying to wrap around the step by step process for swapping the wires one or two at a time. The mast will remain on the vessel. It is a dual spreader, deck stepped, 12mt from deck to top.

Should we start at the top or the bottom ?

I was thinking of replacing all the lower shrouds first x 4, then the innerforestay, forestay, backstay and last being the uppers and caps. The problem with the uppers and caps is they clevis on to a common triangular plate that itself is clevised to the chainplate. So, if I loosen one stay, then both will loosen.

Should we use any extra support, temp stays, etc ?

Any tips to make that process easier are appreciated.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 02:17 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.