SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #7  
Old 02-16-2008, 02:11 AM
Ian McColgin Ian McColgin is offline
Senior Member
 
Join Date: Jun 2005
Location: Hyannis, MA
Posts: 368
Default

Nice ash rollers, quite a chore to make and pricy to buy, come in two halves and lash in place. Not really suitable for PVC. So best approach is to install the PVC before any terminals are fitted to the stay. The exception might be if you have a turnbuckle stud swaged directly to the stay. Then the inside diameter of a suitable bit of PVC pipe might fit over. But who remembers that?

In warm weather you can cut down one wall. I experimented with a table saw but the kerf was too big. Works best to use a hacksaw blade unsupported, just tape one end, wear gloves, or have really hard hands. Have the teeth oriented so the cut is on the pull stroke. It's amazing how quickly and easily you can go. Once cut, you can then open a bit of tube at a time, slipping the PVC pipe over the stay. Have some of that PVC solvent-cement. Dope the slit and use little bits of duct tape at frequent intervals to hold the slot closed till it cures. Peel the tapes and presto!
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 11:49 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.