SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 12-22-2016, 06:18 PM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Catching up

Hello all,
For the past 6 weeks, I have been utterly immersed in rerigging the replica of the "Columbia Rediviva." In Disneyland. Yes, it is Disneyland, but it is a real rig, and the people who run the place have given me encouragement to do it right. Working with other sailors and riggers from my part of the world, as well as with the utterly talented, devoted-to-the-ship riggers who work at the park, we have been serving, seizing, and splicing all day, every day, with rope ranging from 3/8" to 2" in diameter. Hundreds of pieces of work, and as of yesterday we began installing some of them onto the lower masts.
Unfortunately, I have been a little scarce here, and I am sorry for that. But things have levelled out at the loft somewhat, and I hope to be more attentive to actual posts, as well as being more prompt at removing the weird spam posts that have been cropping up.
Fair leads,
Brion Toss
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 08:30 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.