SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #9  
Old 11-29-2011, 05:44 PM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Preventer

Quote:
Originally Posted by matt the rigger View Post
The lower stretch the better. I agree with Brian that there should not be a "weak link". And the shock cord in the line has been done for years.
Yes, true, I have done it for years. The first place I saw it was in a 3-strand mooring line. That would have been somewhere around 1980. You'll find a description in the Apprentice. Since then I've been playing with it in a variety of constructions, currently in mooring lines.
Fair leads,
Brion Toss
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 10:55 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.