SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2  
Old 12-18-2010, 12:45 AM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Options

Hello,
First, the mast is already compromised by that crack, so is no longer exactly a continuous extrusion. The question is, how can you restore it?
If I am thinking of the same mast, the spreader bases are not flush with the mast, and they also take shroud loads, with stemball sockets built into the casting; not clear on how you could hope to double this one, except internally, and that would be a neat trick, but would provide strength too far away from that failing metal adjacent to the weld. So I like the grind-it-flush-and-start-over option. Lots of overlap, no stress risers, fasteners as well as adhesive -- it'll be stronger than new. Wouldn't hurt to drill-stop that crack first. And maybe six feet is more than you need.
Once the doublers are on, consider going with a saner configuration, with spreader brackets or through-mast spreader tenon, independent of conventional external tangs. The original configuration was a mass-production convenience, not the best way to do the two jobs. There's a reason they don't make them that way any more...
Fair leads,
Brion Toss
Reply With Quote
 


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 08:40 PM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.