SparTalk
EDUCATION CATALOG RIGGING CONSULTATION HOME CONTACT US

Go Back   SparTalk > SparTalk
FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Display Modes
  #11  
Old 05-14-2010, 10:04 PM
Brion Toss Brion Toss is offline
Moderator
 
Join Date: Jun 2005
Posts: 1,180
Default Shrinkage

Hi again,
When you make this type of splice, the part you bury the tail in gets fatter and shorter -- like we all do -- so you need to add a bit to compensate before splicing. The amount will vary depending on rope construction and diameter, as well as the overall length and the taper of the tail. A couple of inches is fairly typical, but you can zero in by making a mark a known distance from the bearing point of the eye, before splicing, and then seeing how much it has moved after splicing.
Also, have you also deducted for constructional stretch? In most HM it is about a foot in fifty feet.
Fair leads,
Brion Toss
Reply With Quote
  #12  
Old 05-18-2010, 11:27 AM
seawolf seawolf is offline
Senior Member
 
Join Date: Apr 2008
Posts: 111
Default HM Stretch

Hello all.
Brion. Thanks for your latest reply on my post.
Possibly when I put a lot of tension on the life lines, I will gain a couple of inches in the process.
Is it a common practice to pre-stretch the HM lines before attempting a splice, especially when you are talking long lengths as in stays and shrouds?
Or is this measurement something riggers compensate for through experience?
Possibly both?
And and at what point would you be certain to have stretched enough for proper measurement thereafter?
Thanks.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is On


All times are GMT -7. The time now is 09:51 AM.


Powered by vBulletin® Version 3.6.7
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.