View Single Post
  #4  
Old 05-10-2008, 08:24 AM
benz benz is offline
Senior Member
 
Join Date: Sep 2006
Location: Newport RI
Posts: 244
Default

Thanks, Brian

The rubber foot thing is a good idea. Your instinct was correct: the base has holes for 3/4 bolts. Since I designed the partners to have a pole go through them instead of on them, I'll probably still just chop off that base and keel-step the thing, but still, I like to fully explore all the options.
I've heard good testimonials on welded masts, but being the worrier that I am, I know I would spend every dark and stormy night just waiting for that weld to fail, and balefully eyeing the place on the mast where I knew it to be.
When you sleeve two poles, do you manage to find a separate piece of tubing with just the right OD to fit inside the two pieces being joined, or do you take a bit of the same tubing and slit it lengthwise to make it smaller around?
Ben
Reply With Quote